Envisioned NRE for cost reduction
Cost reduction mainly dependent on required optical performance. Generally, the percentage of optics, electronics, and mechanical parts of the BOM are 45~50%, 35~40%, and 15%, respectively.1. Electronics
- New digital circuits needed.
2. Mechanical engineering
- No substantial NRE is foreseen.
- Reduced number of parts
- Parts as simple as possible
3. Optics
- Changes to the design will involve some qualification steps
4. System engineering
- New system design and qualification.
- NRE varies with the required level of qualification requested
- EMI testing,
- Thermal cycling
No comments: